Mostrar el registro sencillo del ítem
Evaluación de la PTAR tauramena
dc.contributor.advisor | Romero Rojas, Jairo Alberto (dir) | spa |
dc.contributor.author | García Jara, Evelin de la Mercedes | spa |
dc.contributor.author | Longas Jiménez, César Augusto | spa |
dc.date.accessioned | 2016-05-03T15:55:25Z | spa |
dc.date.accessioned | 2021-10-01T15:26:30Z | |
dc.date.available | 2016-05-03T15:55:25Z | spa |
dc.date.available | 2021-10-01T15:26:30Z | |
dc.date.issued | 2016 | spa |
dc.identifier.uri | http://catalogo.escuelaing.edu.co/cgi-bin/koha/opac-detail.pl?biblionumber=18217 | spa |
dc.identifier.uri | https://repositorio.escuelaing.edu.co/handle/001/380 | |
dc.description.abstract | "El sistema (Ilustración 1) pertenece a un tratamiento biológico conformado por dos trenes en paralelo de Lagunas de Estabilización, compuesto por: sistema de pretratamiento, dos lagunas Anaerobias, dos lagunas Facultativas y dos lagunas de maduración. El ingreso del caudal a la planta se realiza por medio de una cámara de entrada en donde se conectan las descargas finales del sistema de alcantarillado, compuesto por dos redes paralelas de tubería de 24”. A continuación, el flujo pasa a una estructura de control de excesos, que controla el caudal que debe entrar al tratamiento y vierte los excesos, directamente al efluente de la planta. Continúa con dos rejillas en serie a lo ancho de un canal de conducción y a una canaleta Parshall; posteriormente se tiene un desarenador de dos cámaras en paralelo, seguido del sistema de pretratamiento antiguo y de uno nuevo, el cual consta de cámara de llegada, cámara de repartición, sistema de cribado y desarenador. Después del pretratamiento el caudal pasa a un sifón que se encarga de alimentar cada tren de lagunas Anaerobias, facultativa y maduración. Y finalmente pasa a la cámara de salida del efluente. (Longas Jimenéz, 2015)"--Resumen | spa |
dc.description.abstract | "The system (Figure 1) belongs to a biological treatment consists of two trains in parallel stabilization ponds, consisting of:. Pretreatment system, two lagoons Anaerobic two facultative lagoons and two maturation ponds income flow to the plant is performed by means of an inlet chamber where the final discharge of the sewage system, consisting of two parallel networks of pipe 24 "are connected. then, the flow proceeds to a control structure of excesses, which controls the flow . you should enter the treatment and pour the excess directly to the mill effluent continues with two grids in series across the width of a raceway and Parshall Flume, then you have a sand trap two cameras in parallel, followed by the system old pretreatment and a new one, which consists of arrival chamber, chamber distribution system, screening and grit removal. After pretreatment flow passes to a siphon that is responsible for feeding each train lagoons anaerobic, facultative and maturation. And finally passes to the outlet chamber effluent. (Longas Jimenéz, 2015.) "- Summary | eng |
dc.format.mimetype | application/pdf | spa |
dc.language.iso | spa | spa |
dc.publisher | Escuela Colombiana de Ingeniería Julio Garavito | spa |
dc.rights | Derechos Reservados - Escuela Colombiana de Ingeniería Julio Garavito | spa |
dc.rights.uri | https://creativecommons.org/licenses/by-nc/4.0/ | spa |
dc.subject | Tratamiento de aguas residuales | spa |
dc.subject | Lagunas de estabilización | spa |
dc.title | Evaluación de la PTAR tauramena | spa |
dc.type | Trabajo de grado - Maestría | spa |
dc.type.version | info:eu-repo/semantics/publishedVersion | spa |
oaire.accessrights | http://purl.org/coar/access_right/c_abf2 | spa |
oaire.version | http://purl.org/coar/version/c_970fb48d4fbd8a85 | spa |
dc.description.degreelevel | Maestría | spa |
dc.description.degreename | Magíster en Ingeniería Civil con Énfasis en Recursos Hidráulicos y Medio Ambiente | spa |
dc.publisher.program | Maestría en Ingeniería Civil con Énfasis en Recursos Hidráulicos y Medio Ambiente | spa |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | spa |
dc.rights.creativecommons | Atribución-NoComercial 4.0 Internacional (CC BY-NC 4.0) | spa |
dc.type.coar | http://purl.org/coar/resource_type/c_bdcc | spa |
dc.type.content | Text | spa |
dc.type.driver | info:eu-repo/semantics/masterThesis | spa |
dc.type.redcol | http://purl.org/redcol/resource_type/TM | spa |
dc.subject.keywords | Wastewater Treatment | spa |
dc.subject.keywords | Stabilization Ponds | spa |
dc.relation.indices | CORPOICA | spa |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
CF - Trabajos de Grado Maestría en Ingeniería Civil [421]
Trabajos de Grado de la Maestría en Ingeniería Civil de la Escuela Colombiana de Ingeniería Julio Garavito -
NA - corpoica [49]
Documentos compartidos con la Red de Corpoica