UA-61751701-2

Listar LA - Trabajos de Grado Especialización en Desarrollo y Gerencia Integral de Proyectos por fecha de publicación
    • español
    • English
EscuelaIng
  • español 
    • español
    • English
  • Login
  • Inicio
  • Guías de Uso
    • Directrices
    • Procedimientos de Trabajo de Grado
    • Guía de Autoarchivo
    • Formato de Autorización para Publicación
  • Navegar
    • Comunidades
    • Autores
    • Títulos
    • Fechas
    • Materias
    • Tipo de Material
  • Investigadores
  • Organizaciones
  • Proyectos

Repositorio Digital

  • Comunidades Comunidades
  • Autores Autores
  • Títulos Títulos
  • Fechas Fechas
  • Materias Materias
  • Tipo de Material Tipo de Material
Listar LA - Trabajos de Grado Especialización en Desarrollo y Gerencia Integral de Proyectos fecha de publicación 
  •   Repositorio Escuela Colombiana de Ingeniería Julio Garavito
  • 1- Tesis de Grado y Trabajos Dirigidos
  • L - Unidad de Proyectos
  • LA - Trabajos de Grado Especialización en Desarrollo y Gerencia Integral de Proyectos
  • Listar LA - Trabajos de Grado Especialización en Desarrollo y Gerencia Integral de Proyectos fecha de publicación
  •   Repositorio Escuela Colombiana de Ingeniería Julio Garavito
  • 1- Tesis de Grado y Trabajos Dirigidos
  • L - Unidad de Proyectos
  • LA - Trabajos de Grado Especialización en Desarrollo y Gerencia Integral de Proyectos
  • Listar LA - Trabajos de Grado Especialización en Desarrollo y Gerencia Integral de Proyectos fecha de publicación
JavaScript is disabled for your browser. Some features of this site may not work without it.

Cambiar vista

Listar

Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasTipo de MaterialEsta colecciónPor fecha de publicaciónAutoresTítulosMateriasTipo de Material

Mi cuenta

AccederRegistro

Listar LA - Trabajos de Grado Especialización en Desarrollo y Gerencia Integral de Proyectos por fecha de publicación

Ordenar por:

Orden:

Resultados:

Mostrando ítems 1-20 de 110

  • título
  • fecha de publicación
  • fecha de envío
  • ascendente
  • descendente
  • 5
  • 10
  • 20
  • 40
  • 60
  • 80
  • 100
    • Elaboración del estudio de prefactibilidad para el montaje de una Planta de Producción de Aceite a partir de semillas oleaginosas 

      Díaz Duarte, Hernán Dario; López Cely, Carolain; López Díaz, Yobany Ernesto (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2013)
      The project is conceived with the intention of setting up a plant for the production of vegetable oil from oil seeds other than African palm. The initiative arises taking into account that in the country is being promoted ...
    • Elaboración de una guía procedimental de Gerencia de Proyectos en las áreas de conocimiento de alcance, tiempo y costo, y el grupo de procesos de iniciación para los proyectos de construcción de vías en la Compañía Geicoc S.A.S. 

      Arrieta Velez, Octavio Rey; Betancourt García, Juan Carlos; González Prieto, Luis Eduardo (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2013)
    • Diseño de una oficina de Gestión de Proyectos para la vicepresidencia de Ingeniería de HMV Ingenieros Ltda. 

      Gómez Camacho, Diana; Vidal Caicedo, Carolina; Pardo González, Germán (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2013)
      Se presentan en este informe los resultados de las actividades adelantadas en el marco del Trabajo de Grado “Diseño de una PMO (Oficina de Gestión de Proyectos) para la Vicepresidencia de Ingeniería de HMV ingenieros”. ...
    • Diseño y elaboración de la guía procedimental para el desarrollo de proyectos dentro de la empresa construcciones y equipos 

      Gómez Monroy, Juliana; Guevara Crisrancho, Paula Andrea; Pinilla Acosta, Katherine (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2013)
    • Diseño y desarrollo del manual de proyectos de investigación para la Unidad de Proyectos de la Escuela 

      Buitrago Mora, Yery Rocío; Romero Ardila, Ingrid Paola; Urrego Díaz, Alejandro (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2013)
      The degree work was focused on the design and development of a manual for the design and development of projects with emphasis on research, which has as main objective to be an enabler for researchers, to manage their ...
    • Derterminación del grado de madurez en la gestión de proyectos de TELMACOM LTDA. bajo el estándar metodológico del PMI® 

      Fandiño Farfan, Juan Gabriel; Lizarazo Marriaga, Sergio Leonardo; Olmos Garzón, Mauricio Javier (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2013)
      The Colombian companies that provide engineering services are implementing best practices in the integral management of projects, in order to improve their processes and obtain the results expected by the interested parties. ...
    • Montaje de una red de Hostales en el Departamento de Boyacá 

      Pradilla Reyes, Carolina; Reyes Peña, Carlos; Rodríguez Porras, Thomas (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2013)
      The project consists of the assembly of a lodging network composed of 10 hostels, located in the Department of Boyacá, Colombia. A business opportunity has been identified in the tourism sector in this Department due to ...
    • Montaje de una empresa comercializadora internacional de Textiles y confecciones en Colombia 

      Orjuela Díaz, Eder Aleixo; Rueda Buenaventura, Johana Paola; Santacruz Martínez, Juan Carlos (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2013)
      Durante los últimos años, el sector de textiles y confecciones en Colombia ha sido reconocido internacionalmente y ha sobresalido en comparación con otros países latinoamericanos, debido principalmente a la innovación, el ...
    • Elaboración del estudio de prefactibilidad para el montaje de Servicio de Gerencia de proyectos en la Empresa WSI Ltda. 

      Mogollón Parada, Martha Cecilia; Duque Carvajal, Martha Lucia; Alejo Villamil, Monica Liliana (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2013)
      The following document presents the "Preparation of the Pre-Feasibility Study for the Assembly of the Project Management Service in WSI Ltda." For the hydrocarbon sector that is where WSI Ltda. Has experience and on which ...
    • Desarrollo de una herramienta para planear el costo de las actividades asociadas a la perforación de un pozo de petróleo convencional vertical para las empresas del sector de hidrocarburos en Colombia 

      Clavijo Rodríguez, Jennifer Adriana; Figueroa Greco, Martin Alfonso; Serrano Cabeza, Mauricio (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2014)
      The objective of this project is the development of a standardized tool to plan the cost of the activities associated with the drilling of a vertical conventional oil well for companies in the hydrocarbon sector in Colombia. ...
    • Estudios de pre-factibilidad para la comercialización de viguetas tipo JOIST para Codising LTDA 

      Bernal Balnco, Fernando; Mendoza Forero, Carlos (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2014)
      The growth of the country's economy in recent years is reflected directly in the construction sector, and has forced construction companies to respond to the need to execute projects in shorter times, maintaining quality ...
    • Elaboración del estudio de prefactibilidad para el montaje del centro de conectividad y cultura Cibercity en Bogotá 

      Abril Becerra, Gladys Helena; Chacón Abas, Ziad; Sánchez Fuentes, Mónica Julieth (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2014)
      This document presents the results of the final report of the degree work entitled "Pre-feasibility study for the assembly of the CiberCity connectivity and culture center in Bogotá". The product of the project is the ...
    • Estudio de prefactibilidad del montaje del centro distrital de resonancia magnética de Bogotá 

      Daza Rodriguez, Fernando Enrique; Morales Tarquino, Viviana Marcela; Rocha Ortega, Julián Felipe (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2014)
      The Degree Work presented below corresponds to the Pre-Feasibility Study for the Assembly of the District Resonance Center in Bogota, which is part of the Specialization of Development and Integral Project Management of ...
    • Estudios de prefactibilidad para el montaje de una empresa de servicios de alquiler de helicópteros para ejecutivos en Colombia 

      Delgado Sandoval, Eduardo Ignacio; Duque Garzón, Julián Felipe; Noreña Rubio, María Natalia; Silva Núñez, Pablo César (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2014)
      The development of an entrepreneurial project requires a high level of detail so that the results, linked to their proper development, are as expected. In the present work of degree the prefeasibility study of the assembly ...
    • Estudio de prefactibilidad para el montaje de un sistema de energía alternativa en el banco de hielo de la planta Alquería Santa Marta 

      Lizcao Martínez, Juan Pablo; Ramírez Gómez, Edna Margarita; Rodríguez Ramírez, Natalia Ximena (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2014)
      The Colombian School of Engineering Julio Garavito, in the Program of Specialization in Development and Integral Management of Projects, establishes as a requirement to obtain the Specialist Degree the elaboration of a ...
    • Estudio a nivel de prefactibilidad para el montaje de un sistema de prevención y solución a los problemaas de inestabilidad geológica en las líneas de transmisión (L.T.) pertenecientes a la EEB: caso línea de transmisión de energía Guavio - Reforma - Tunal en las torres de la 93 a la 99 

      Prieto Casallas, Edwin Andrés; Londoño Osorio, Daniel Augusto (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2014)
    • Elaboración del estudio de prefactibilidad para el montaje de una empresa para ofrecer servicios de taxi seguro por medio de dispositivos móviles en la ciudad de Bogotá 

      Castro Suárez, Lizzeth Yolanda; Franco Parado, Luis Felipe; Ibarra Cáceres, Santiago (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2014)
      The project consists of the development of an application for mobile devices for safe taxi service in the city of Bogotá, which allows verification of taxi registration prior to boarding, thus reducing the risk of being a ...
    • Elaboracíon de los estudios de pre-factibilidad para la creación de una empresa de lavado de automóviles a domicilio con productos biodegradables en la ciudad Bogotá 

      Ramírez Saenz, Paola Andres; Gómez Espitia, Jackeline Rocio; Guzmán Ramirez, Adriana (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2014)
      Taking into account the relevance of the planning and control in the projects, the Project Book is developed, which aims to be a guide that must be taken into account at the time of preparation of the pre-feasibility ...
    • Diseño de la webs para la estimación de costos y beneficios de los proyectos de hidrocarburos del área de desarrollo de nuevos campos de cepcolsa 

      López Molano, Amaru Santiago; Parra Niño, Ramiro; Reyes Jiménez, Camilo Alberto; Vargas Cortés, Diego (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2015)
      The methodology used by the authors in the development of the project and the work of degree, allowed the construction of a WBS type, for the projects of crude production of the company CEPCOLSA, which managed to link ...
    • Estudio de pre factibilidad para el montaje del laboratorio de caracterización de hidrocarburos no convencionales para el sector dowstream de la compañía SGS Colombia S.A. 

      Arias Ospina, Carolina; Arias Sanchez, Miguel Alejandro (Escuela Colombiana de Ingeniería Julio GaravitoEspecialización en Desarrollo y Gerencia Integral de Proyectos, 2015)
      This work of degree presents the prefeasibility of the assembly of a laboratory for the characterization of unconventional hydrocarbons; This document gathers all the information, analysis, structures and recommendations ...

      Envíos recientes

      • Elaboración del estudio de prefactibilidad para el montaje de una Planta de Producción de Aceite a partir de semillas oleaginosas

        ...

        Díaz Duarte, Hernán Dario | 2013

        The project is conceived with the intention of setting up a plant for the production of vegetable oil from oil seeds other than African palm. The initiative arises taking into account that in the country is being promoted in a systematic way the increase of agricultural production and with this incentivizing the agroindustrial development projects with the support of the government and other institutions and given the fact that in Colombia there is great potential for the cultivation of species such as soybean, sunflower, among others and there are traditional crops such as corn, coconut, cotton, peanuts, etc. The oleaginous industry in Colombia is represented mainly by Fedepalma, whose statistical and technical records are important inputs for the development of this research, together with data from other Colombian sources and institutions such as DANE, DIAN, Ministry of agriculture and rural development, Ministry of industry and commerce, Fedebiocombustibles, among many others referenced in the development of work. By developing the research and analyzing the data found in the different sources, it was determined that not all the oilseed species that are grown in the country are produced in sufficient quantities to implement a project of this magnitude and that all the seeds have convenient characteristics in terms of the amount of oil produced, production process, cultivation areas, etc. Therefore, an analysis of the seeds was initially carried out to determine a small group of seeds with which the research would be continued. From the analysis, it was determined that the optimum seeds for the process are cottonseed and soybeans, for which the other studies that give definitive form to a project with great national potential are carried out. clear in the following sections.

        LEER

      • Elaboración de una guía procedimental de Gerencia de Proyectos en las áreas de conocimiento de alcance, tiempo y costo, y el grupo de procesos de iniciación para los proyectos de construcción de vías en la Compañía Geicoc S.A.S.

        ...

        Arrieta Velez, Octavio Rey | 2013

        LEER

      • Diseño de una oficina de Gestión de Proyectos para la vicepresidencia de Ingeniería de HMV Ingenieros Ltda.

        ...

        Gómez Camacho, Diana | 2013

        Se presentan en este informe los resultados de las actividades adelantadas en el marco del Trabajo de Grado “Diseño de una PMO (Oficina de Gestión de Proyectos) para la Vicepresidencia de Ingeniería de HMV ingenieros”. Este abarcó las actividades de diagnóstico en gerencia de proyectos de la organización y diseño de una PMO. Con el objetivo de investigar sobre los fundamentos teóricos, se consultaron varias referencias especializadas, en los siguientes temas: Metodología para la Gerencia de Proyectos, tipos de PMOs, diseño y funciones de PMOs y modelos existentes para medir la madurez de una organización en gerencia de proyectos.

        LEER

      • Diseño y elaboración de la guía procedimental para el desarrollo de proyectos dentro de la empresa construcciones y equipos

        ...

        Gómez Monroy, Juliana | 2013

        LEER

      • Diseño y desarrollo del manual de proyectos de investigación para la Unidad de Proyectos de la Escuela

        ...

        Buitrago Mora, Yery Rocío | 2013

        The degree work was focused on the design and development of a manual for the design and development of projects with emphasis on research, which has as main objective to be an enabler for researchers, to manage their projects and for students and teachers with knowledge of project management in designing projects focused on research, innovation and development. The manual is composed mainly of four large segments, divided into 8 modules. The first segment, composed of the first module, is focused on the generality of the manual, that is, it focuses on explaining to the reader the why? of the manual and its added value, presenting at the end the map of processes that contains in detail the manual, with all the value proposal for the development of the research and the methodological design of the same. For the development of this manual, five normative and conceptual references were taken in the management of projects: the Colombian School of Engineering Julio Garavito, Colciencias and the National Planning Department, the Colombian Technical Standards ISO, the guidelines of the Project Unit of the School, and the PMI PMBOK Guide, as the main reference.

        LEER

      • Derterminación del grado de madurez en la gestión de proyectos de TELMACOM LTDA. bajo el estándar metodológico del PMI®

        ...

        Fandiño Farfan, Juan Gabriel | 2013

        The Colombian companies that provide engineering services are implementing best practices in the integral management of projects, in order to improve their processes and obtain the results expected by the interested parties. The project consists in the determination of the degree of maturity in the project management of TELMACOM LTDA., Under the methodological standard of the PMI®. The foregoing is based on the fact that the company under study recognizes having strong weaknesses when planning, executing and finalizing its projects. The management of projects has become methodological practices of great importance for this type of companies, highlighting the different needs that organizations show when they recognize that the management of projects they have presents problems and strong weaknesses when it comes to development and final achievement of your services, products or projects. In the sector of engineering construction companies, the integral management of projects is not efficiently developed, where this practice is not executed under any guidelines or standards, thus demonstrating little commitment to meeting the needs of the companies. clients, represented in deficient projects, with absences of planning for their execution, evident on costs, and deficient quality in the final product or service developed in some cases. In accordance with the above, the vast majority of companies in the sector show a lack of organizational culture in relation to the implementation of methodologies or project management standards, in order to generate in organizations a higher level of skills, commitment integral with the projects and the expectant needs of the clients. The general objective of this study is to diagnose the degree of maturity and determine the level of perception in the organizational management of projects Telmacom Ltda., Using as a tool the methodological standard proposed by OPM3®, proposing as products of analysis and diagnosis a proposal both technical and administrative that allows the company to improve the current level of its project management. The study points out the following specific objectives to achieve:  Identify the degree of compliance with the best practices associated with the SMCI category (standardization, measurement, control and improvement),  Identify, through the use of the methodological standard proposed by OPM3®, the degree of compliance in the methodology of processes of the Project domain, in accordance with the 9 areas of knowledge and 5 groups of processes. To elaborate in accordance with the results obtained a proposal of improvement at the level of maturity in the management of projects for the company, which will contain, among others, a technical proposal and an administrative proposal for the improvement of the maturity in the management of projects in Telmacom Ltda. The methodology used for the development of this study consisted of the collection and analysis of company information, as well as the preparation of fieldwork, which consisted in the presentation and global awareness of the purpose of the study to those involved in the company Telmacom Ltda. . Additionally, in order to conceptualize the interested parties, a training was held where the fundamental concepts of the OPM3® model of the PMI® will be presented. As a result of the exercise of the fieldwork, structured and completed interviews were obtained from the respondents selected by the company, which constitute the main information to continue with the development of the project, to determine the state in which the company is located. at the level of project management, as well as to have the starting point for the planning of the improvement proposal. The present work, is structured its chapter first by the Profile of the selected company object of the present study, which includes the general description and the profile of the company. In the second chapter is the theoretical framework consulted with reference to the conceptual foundations of the administration and project management of the Project Management Institute PMI®. Subsequently, in the third chapter, the maturity model in project management, OPM3®, is related. In the fourth chapter, the methodological development is carried out. Moving on to the fifth chapter, we present the analysis of results obtained from the study based on the interpretation of results and graphs constructed with the data obtained from the interviews. Finally, in the sixth chapter, a proposal for improvement at the level of maturity in the management of projects for companies is presented.

        LEER

      • Montaje de una red de Hostales en el Departamento de Boyacá

        ...

        Pradilla Reyes, Carolina | 2013

        The project consists of the assembly of a lodging network composed of 10 hostels, located in the Department of Boyacá, Colombia. A business opportunity has been identified in the tourism sector in this Department due to its great potential, as it has a great cultural, artisanal and architectural history, as well as having in its territory natural parks, lagoons, reservoirs, rivers and numerous natural waterfalls. The growth of tourism in Colombia in recent years generates different needs to be addressed; specifically in Boyacá there is no organized chain of hostels where the user can register and sharpen to access different benefits, so generating a lodging option in different places within the Department becomes a requirement to help meet the objectives of the country in relation to tourism. The main feature of this type of hosting is the low cost that the user must pay per night, obtaining a high quality service. Hostel is understood as the definition presented by the Icontec Colombian Sectorial Technical Standard NTSH 006: "A hostel is an establishment in which the hosting service is provided preferably in semi-private or common rooms, as well as its bathrooms, and which may also have, of a common room adequately equipped for guests to prepare their own food, without prejudice to provide other complementary services. "

        LEER

      • Montaje de una empresa comercializadora internacional de Textiles y confecciones en Colombia

        ...

        Orjuela Díaz, Eder Aleixo | 2013

        Durante los últimos años, el sector de textiles y confecciones en Colombia ha sido reconocido internacionalmente y ha sobresalido en comparación con otros países latinoamericanos, debido principalmente a la innovación, el diseño y calidad en sus creaciones, posicionándose como uno de los epicentros de la moda en Latinoamérica. De acuerdo con las oportunidades que ofrece el mercado internacional y las necesidades del sector en Colombia, se analiza la viabilidad de un proyecto para el Montaje de una Empresa Comercializadora Internacional de Textiles y Confecciones para exportación de productos hacia los mercados de Estados Unidos, Canadá y Europa. En el Trabajo de Grado se realiza el Estudio de Pre-factibilidad del proyecto, para lo cual se tomó como base el modelo de Gestión Integral de Proyectos desarrollado por la Escuela Colombiana de Ingeniería Julio Garavito en alineación con los conocimientos adquiridos a lo largo de la especialización. El informe se compone de la documentación del proyecto, donde se elabora el Perfil, Identificación y Alineación Estratégica del Proyecto, Formulación y Evaluación del mismo; así como, el libro del Proyecto, donde se presentan los entregables gerenciales y los ejercicios de habilidades gerenciales respectivos.

        LEER

      • Elaboración del estudio de prefactibilidad para el montaje de Servicio de Gerencia de proyectos en la Empresa WSI Ltda.

        ...

        Mogollón Parada, Martha Cecilia | 2013

        The following document presents the "Preparation of the Pre-Feasibility Study for the Assembly of the Project Management Service in WSI Ltda." For the hydrocarbon sector that is where WSI Ltda. Has experience and on which the different studies focused . However, as a result of the research it is recommended to take into account other sectors that demand the Project Management service. Below is a brief reference to what will be found in each of the studies carried out: Market Studies: Supply and demand studies were carried out for which, at the level of the Offer, the companies that currently provide the Project Management service for the hydrocarbons sector were identified and analyzed. Reviewing in detail the most recognized by their size and experience and demand level, the studies focused on the 10 oil operators with the highest production in the last year and the five most important complementary services companies, as well as the verification of the new multinationals that will arrive in the country through the 2012 round of the ANH, taking into account the projects currently being developed and the future ones, where the competition that exists to provide the service is observed Technical Studies: This study evaluated the macro and micro location of WSI Ltda., In relation to potential clients and revised the plans for the remodeling of the offices recommending the location of the area for the assembly of the Project Office , taking into account what is necessary for its operation. Likewise, the documentary standard and the components to be handled for the start-up of the service are considered. Additionally, the costs calculated for the furniture, equipment and software necessary for the operation are listed. Administrative Studies: In this study the revision of the current organizational structure of WSI Ltda. And the incorporation of the service to it was carried out, for which purpose the identification of the profiles, functions, responsibilities, as well as the assignment of resources, salaries, type of contract and hiring process of the professionals that will become part of the Project Management team. Additionally, an administrative cost calculation was made for the operation of the service. Environmental Studies: Because the assembly of the service does not generate a detriment to the environment and additionally within the policies of WSI Ltda. A series of measures have been implemented to mitigate and perform the waste management and other activities of the works in office; additionally and taking into account that they have the ISO 14001 certification, criteria and parameters were identified that WSI Ltda., must validate and value during the execution of the Environmental Management Plans in the development of the projects, in compliance with the environmental regulations applicable. Financial and Financing Studies: The calculation of the investment of the project was made, taking into account the costs of the pre-feasibility study, the costs and expenses foreseen in the market, technical and administrative studies of the present study and the projected costs of the feasibility study. For this study, two types of contracts to be executed were established (Type 1: Feasibility studies and Type 2: Management of the construction of plants and stations in the hydrocarbon sector); additionally, for the calculation of sales, two scenarios were established: prudent optimist and equilibrium point, with which sales (income) and costs and expenses in the execution of contracts can be foreseen. With this information, the approach for the three defined sales alternatives was made and the cash flow of the project for each was obtained, obtaining some conclusions, findings and recommendations. Financial Evaluation: Of the three alternatives proposed in the financial and financing study, the one that was considered the closest to the reality of the sales to be obtained and based on the cash flow of the selected alternative was selected, the IRR and the NPV were calculated. (which were the criteria established for the financial evaluation) in different situations; performing a sensitivity analysis that allows observing the limits that can be reached in the development of the project without it ceasing to be profitable.

        LEER

      • Desarrollo de una herramienta para planear el costo de las actividades asociadas a la perforación de un pozo de petróleo convencional vertical para las empresas del sector de hidrocarburos en Colombia

        ...

        Clavijo Rodríguez, Jennifer Adriana | 2014

        The objective of this project is the development of a standardized tool to plan the cost of the activities associated with the drilling of a vertical conventional oil well for companies in the hydrocarbon sector in Colombia. The development of this tool seeks to contribute to the competitiveness and productivity of companies in the hydrocarbon sector in Colombia, because the tool will allow costing oil wells with deviations of less than 10%, making the tool more accurate and accurate. Likewise, with the development of the same one will be able to realize changes of agile and efficient way without altering the formulation of obtaining of the budget. The tool will allow to plan, control and evaluate accurately and efficiently the cost of drilling an oil well, allowing to optimize and prioritize the resources of each of the projects, reducing the costs incurred in re-processes during the execution of the same.

        LEER

      • Estudios de pre-factibilidad para la comercialización de viguetas tipo JOIST para Codising LTDA

        ...

        Bernal Balnco, Fernando | 2014

        The growth of the country's economy in recent years is reflected directly in the construction sector, and has forced construction companies to respond to the need to execute projects in shorter times, maintaining quality and efficiency. compliance with the norms and codes of the construction sector. To answer this need, the company CODISING LTDA. sought the possibility of venturing into the design and marketing of "Joist" type joists, a product that allows obtaining shorter installation times and construction of mezzanine flooring in buildings and with a better price than similar products due to its greater efficiency in terms of of weight per linear meter. The present Degree Work made it possible to determine the viability of the project, for which market, technical, environmental, administrative, financial and financing studies were carried out, as well as presenting the corresponding Management Plan; the previous thing following the methodologies and lessons received in the Specialization in Development and Management of Projects of the Colombian School of Engineering "Julio Garavito". Based on the findings, conclusions and recommendations made to the different studies and analyzed the financial viability of the Project, it was determined that the commercialization of "Joist" joists is viable according to the requirements defined by the interested parties and is an alternative that would contribute to the fulfillment of the objectives of the company CODISING LTDA. and to the objectives of economic growth of the Nation. The authors of this document are students of the academic program in mention, under the guidelines of the Project Management Institute for the corresponding to integral management of projects.

        LEER

      • Elaboración del estudio de prefactibilidad para el montaje del centro de conectividad y cultura Cibercity en Bogotá

        ...

        Abril Becerra, Gladys Helena | 2014

        This document presents the results of the final report of the degree work entitled "Pre-feasibility study for the assembly of the CiberCity connectivity and culture center in Bogotá". The product of the project is the CiberCity connectivity and culture center whose main purpose is to expand coverage of access to information and contribute to the promotion of the culture of the Bogota population, through a space of connectivity, entertainment and learning, making use of state-of-the-art information technology tools.

        LEER

      • Estudio de prefactibilidad del montaje del centro distrital de resonancia magnética de Bogotá

        ...

        Daza Rodriguez, Fernando Enrique | 2014

        The Degree Work presented below corresponds to the Pre-Feasibility Study for the Assembly of the District Resonance Center in Bogota, which is part of the Specialization of Development and Integral Project Management of the Colombian School of Engineering July Garavito and includes the stages of Identification and Strategic Alignment of the Project (IAEP), Formulation and Evaluation of the Project.

        LEER

      • Estudios de prefactibilidad para el montaje de una empresa de servicios de alquiler de helicópteros para ejecutivos en Colombia

        ...

        Delgado Sandoval, Eduardo Ignacio | 2014

        The development of an entrepreneurial project requires a high level of detail so that the results, linked to their proper development, are as expected. In the present work of degree the prefeasibility study of the assembly of a company of rent of helicopters for executives is developed, that in addition to being a project of emprendimiento, by its characteristics, requires of a methodology of integral development, that takes into account all the multiple needs and opportunities that point to the increase of the productivity, optimization of times and increase of security in the transport that demands the productive sector at present. The development of this project was realized from three main fronts; as a first instance, the strategic alignment of the project with the country's objectives, followed by a formulation phase that includes market, technical, environmental, administrative and financial studies, and finally a financial evaluation stage in which the financial results of the project are presented. the alternatives selected in the preceding studies.

        LEER

      • Estudio de prefactibilidad para el montaje de un sistema de energía alternativa en el banco de hielo de la planta Alquería Santa Marta

        ...

        Lizcao Martínez, Juan Pablo | 2014

        The Colombian School of Engineering Julio Garavito, in the Program of Specialization in Development and Integral Management of Projects, establishes as a requirement to obtain the Specialist Degree the elaboration of a Degree Work, which allows to put into practice the knowledge acquired during the curriculum. . In this context, the Work Team comprised of students from cohort 16 of the Program, developed as an academic exercise the project called "Pre-feasibility study for the assembly of an alternative energy system in the ice bank of the Alquería Santa Marta plant" . This document provides information on the most relevant aspects regarding the strategic alignment, formulation and evaluation of the Project, through the development of market, technical, environmental, administrative, legal, financial and financing studies; also a summary of the respective Management Plan. It is important to highlight that both the Degree Project and the Project are articulated with the management plans developed in accordance with 9 of the 10 areas of knowledge of the 5th edition of the PMBOK, prioritized by the Work Team.

        LEER

      • Estudio a nivel de prefactibilidad para el montaje de un sistema de prevención y solución a los problemaas de inestabilidad geológica en las líneas de transmisión (L.T.) pertenecientes a la EEB: caso línea de transmisión de energía Guavio - Reforma - Tunal en las torres de la 93 a la 99

        ...

        Prieto Casallas, Edwin Andrés | 2014

        LEER

      • Elaboración del estudio de prefactibilidad para el montaje de una empresa para ofrecer servicios de taxi seguro por medio de dispositivos móviles en la ciudad de Bogotá

        ...

        Castro Suárez, Lizzeth Yolanda | 2014

        The project consists of the development of an application for mobile devices for safe taxi service in the city of Bogotá, which allows verification of taxi registration prior to boarding, thus reducing the risk of being a victim of the crime of express hijacking, known as "millionaire ride". This application will also have other features that provide convenience, such as the request for services door to door, assigning only previously verified taxis. This document includes the pre-feasibility study to evaluate the feasibility of creating a company to offer taxi services through mobile devices in the city of Bogotá. For its realization, the stages of Identification and Strategic Alignment of the Project were developed with the Development Plan 2012 - 2016, Bogotá Humana of the Mayor's Office of Bogotá; Formulation including market, technical, administrative, cost and benefit, financial and financing studies, financial evaluation and, finally, the project management plan.

        LEER

      • Elaboracíon de los estudios de pre-factibilidad para la creación de una empresa de lavado de automóviles a domicilio con productos biodegradables en la ciudad Bogotá

        ...

        Ramírez Saenz, Paola Andres | 2014

        Taking into account the relevance of the planning and control in the projects, the Project Book is developed, which aims to be a guide that must be taken into account at the time of preparation of the pre-feasibility studies, in this case relating it to the project: Creation of a home car wash company with biodegradable products in the city of Bogotá. For the development of this Management Plan, there are PMI and PMBOK guidelines provided by the Specialization in Development and Integral Project Management of the Julio Garavito School of Engineers.

        LEER

      • Diseño de la webs para la estimación de costos y beneficios de los proyectos de hidrocarburos del área de desarrollo de nuevos campos de cepcolsa

        ...

        López Molano, Amaru Santiago | 2015

        The methodology used by the authors in the development of the project and the work of degree, allowed the construction of a WBS type, for the projects of crude production of the company CEPCOLSA, which managed to link directly with the cost benefit evaluation, allowing thus, the comparison between similar projects and considerably streamlining the planning and decision-making processes of investment in new projects in the New Assets area of the company.

        LEER

      • Estudio de pre factibilidad para el montaje del laboratorio de caracterización de hidrocarburos no convencionales para el sector dowstream de la compañía SGS Colombia S.A.

        ...

        Arias Ospina, Carolina | 2015

        This work of degree presents the prefeasibility of the assembly of a laboratory for the characterization of unconventional hydrocarbons; This document gathers all the information, analysis, structures and recommendations given for the success of the pre-feasibility and subsequent execution of the project.

        LEER

      Oferta académica

      Carreras profesionales

      Especializaciones

      Maestrías

      Doctorado

      Nustros Campus

      Introducción al campus

      Tecnología

      Fortalezas

      Premios y reconocimientos

      Flora y fauna

      Visita el campus

      Internacionalización

      Programas y alianzas

      Movilidad

      Sobre la Escuela y Bogotá

      Convenios internacionales, nacionales y con colegios

      Ayuda

      PQRSFC

      Centro de Ayuda

      Contáctenos

      Habeas Data

      Centro de Servicios Tecnológicos

      Directorio Escuela

      acriditación institucional
      icoMaps

      AK. 45 No. 205 - 59, Autopista Norte.

      PBX: +57(1) 668 3600 - Bogotá.

      Línea nacional gratuita:

      018000112668.

      Sistema DSPACE - Metabiblioteca | logo