Publication: Sistema de producción Kanban para el control de los inventarios en la línea de producción del candado tipo alemán 870 en Assa Abloy Colombia
Authors
Abstract (Spanish)
Abstract (English)
Director
Advisors/Directors
Extent
http://creativecommons.org/licenses/by-nc-nd/4.0/
Collections
References
Aghajani, M., Keramati, A. & Moghada, R. T. (2016). A mathematical programming model for cellular manufacturing system controlled by Kanban with rework consideration. International journal advanced manufacturing technology. 83, 1377-1394.
Alabas, C., Altiparmak, F. & Dengiz, B. J. (2002). A comparison of the performance of artificial intelligence techniques for optimizing the number of kanbans. Journal of the operational research society. 53, 907-914.
Bernal, C. (2016). Metodología de la investigación. Pearson educación de Colombia S.A.S. 4, 162-169.
Donald W. (2003). Inventory Control and Management, 2nd Edition. John Wiley & Sons Ltd.
Fukukawa, T., Hong, S.C. (1993). The determination of the optimal number of kanbans in a just-in-time production system. Computers and Industrial Engineering, 24(4), 326-344.
Gilliam, D., Taylor-Jones, S., & Costanza, J. R. (2005). The Quantum Leap: Next Generation: The Manufacturing Strategy for Business. Boca Raton, Fla: J. Ross Publishing.
Gross, J. M., & McInnis, K. R. (2003). Kanban Made Simple: Demystifying and Applying Toyota's Legendary Manufacturing Process. New York: AMACOM.
Hemamalini, B. (2000). Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in Kanban flowshops. Part I & II. International Journal of Production Research. 38(11), 2549-2572.
Hillier, F., & Lieberman, G. (2010). Introducción a la investigación de operaciones. McGrawHill interamericana editors, S.A. C.V. 9, 772- 832.
Hou, T.H., & Hu W. C. (2011). An integrated MOGA approach to determine the pareto – optimal kanban number and size for a JIT system. Expert system with applications. 38, 5912-5918.
Hurnon, R. D. (1997). An example of simulation optimisation using a neural network metamodel finding the optimum number of kanbans in a manufacturing system. Journal of the operational research society. 48, 1105- 1112.
Krajewski, L., Ritzman, L., & Malhotra, M. (2013). Administración de operaciones. Proceso y cadena de suministro, 10, 275-293, 307-430.
Kumar, C. S., & Panneerselvam, R. (2007). Literature review of JIT-KANBAN system, International Journal of advanced Manufacturing Technology. 32, 393-408.
Lasa, I. S., Laburu C. O., & Vila R. (2008). An Evaluation of the Value Stream Mapping Tool. Business Process Management Journal. 14(1), 39–52.
Lavoie, P., Gharbi A., & KenNe J. P. (2008). A comparative study of pull control mechanisms for unreliable homogenous transfer lines. International journal of production economics. 124(1), 241–251.
Markham, I. S., Mathieu, R. G., & Wray, B. A. (1998). A rule induction approach for determining the number of Kanbans in a just-in-time production system. Computers ind. Engng, 34(4), 717-727.
Matta, A., Dallery, Y., & Di Mascolo, M. (2005). Analysis of assembly systems controlled with Kanbans. European Journal of Operational Research, 166, 310-336.
Modak, N.M., Panda, S., & Sana, S. S. (2015). Optimal Just in Time buffer inventory for regular preventive maintenance. Review of Applied Management. 13, 135-144.
Monden, Y. (1983). The Toyota production system. Industrial Engineering and Management Press, Norcross, GA.
Monden, Y. (1996). El just in time hoy en toyota. Bilbao: Ediciones Deusto.
Moore, R. (2007). Selecting the right manufacturing improvement tools. Amsterdam: Elsevier ButterworthHeinemann.
Moran, T, J., & Troutt, M. (2009). A simulation study of economic production quantity lot size to Kanban for a single line production system under various setup time with annual setup cost as performance metric. Journal of business and economic research. 7(10).
Ohno, T. (1991). El sistema de producción Toyota: más allá de la producción a gran escala. Barcelona: Ediciones Gestión.
Ohno, K., Nakashima, K., & Kojima, K. (1995). Optimal number of two kinds of Kanbans in a JIT production system. Int J Prod. 33, 1387-1401.
Panayiotou, C.G., & Cassadras, C.G., (1999). Optimization of Kanban-based manufacturing systems. Automatica. 35, 1521-1533.
Rabbani, M., & Layegh, R. (2009). Determination of number of kanbans in a supply chain system via memetic algorithm. Advances in engineering software. 40, 431-437.
Rothlauf, F. (1998). Design of Modern Heuristics. Springer science business media.
Rahman, N. A., Sharif, S. M., & Esa, M. M. (2013). Lean Manufacturing case study with Kanban system implementation. International conference on economics and business research, 7, 174-180.
Rees. L.P., Philipoom, P.R., Taylor, B.W., & Huang, P.Y. (1987). Dynamically adjusting the number of Kanbans in a just-in-time production system using estimated values of lead time. IIE Transactions 19 (2), 199-207.
Sarker, B. R., & Balan, C. V. (1999). Operations planning for a multi-stage kanban system. European journal of operational research. 112(2), 284-303.