Publication: Effect of Network's Morphology and Merge Bias Correction Procedures on Project Duration Mean and Variance
Abstract (Spanish)
Abstract (English)
Extent
Collections
References
Alfredo H-S. Ang, Amal A. Chaker and Jamal Abdelnour (1975). Analysis of Activity Networks under Uncertainty. Journal of the Engineering Mechanics Division, Vol. 101, No. 4, July/August 1975, pp. 373-387
Buffa, E.S. and Sarin R. k. (1987). Modern Production / Operations Management. 8th Ed. Wiley, New York, 1987.
Chuen-Tao, Luis Y. (1968) Aplicaciones prácticas del PERT y CPM. Gestión Deusto
Clark, Charles E. (1961) The Greatest of a Finite Set of Random Variables. Operations Research. 9, No 2. pp. 145-162.
Clark, Charles E. (1962) The PERT Model for the Distribution of an Activity Time. Operations Research,10 (3), pp. 405-406
Coon, H. (1965) Note on Donaldson's 'The estimation of the mean and variance of a PERT activity time'. Operations Research, 13, pp. 386-387.
Donalson, N. (1965) The estimation of the mean and variance of a PERT activity time. Operations Research,13, pp.382-385
Eckhardt, R . (1987). Stan Ulam, John von Neumann, and the Monte Carlo Method. Los Alamos Science. Special Issue (15), pp. 131-137.
Farnum, N. R. and Stanton, L. W. (1987) Some Results Concerning the Estimation of Beta Distribution Parameters in PERT. Journal of Operational Research Society, 38, pp. 287-290.
Farnun N.R. and Stanton L.W. (1987). Some results concerning the estimation of Beta distribution parameters in PERT. Journal of Operations Research Society, 38, pp. 287-290.
Golenko-Ginzburg D. (1988). On the distribution of activity time in PERT. Journal of Operations Research Society, 39, pp. 767-771.
Grubbs, F. E. (1962) Attempts to validate certain PERT statistics or 'picking on PERT'. Operations Research, 10, pp. 912-915
Hahn, E. D. (2008) Mixture densities for project management activity times: A robust approach to PERT. European Journal of Operational Research, 188, pp. 450-459.
Herrerías-Velasco, J. M., Herrerías-Pleguezuelo, R. and Van Dorp, J. R. (2011) Revisiting the PERT mean and variance. European Journal of Operational Research, 210, pp. 448-451.
Keefer D.L. and Bodily S.E. (1983). Three-Point approximations for continuous random variables. Management Science, 29, pp. 595-609
Keefer D.L. and Verdini W.A. (1993). Better estimation of PERT activity time parameters. Management Science; Sep 1993; Vol. 39, No. 9. pp. 1086-1091
Keefer, D. L. (1993) Better Estimation of PERT Activity Time Parameters. Management Science, 39, No. 9, pp. 1086.
Kerzner H. (1992). Project Management: A Systems Approach to Planning, Scheduling and Controlling. 4th Ed. Van Nostrand Reinhold, New York, 1992
Kerzner H. (2009). Project Management: A Systems Approach to Planning, Scheduling and Controlling. 10th Ed. International Institute for Learning, New York, NYISBN 978-0-470-27870-3
Kotiah, T. C. T., Wallace, N. D. (1973) Another Look at the PERT Assumptions. Management Science, 20, No. 1; pp. 44
Kwak Y.H. and Ingall L. (2007). Exploring Monte Carlo simulation applications for project management. Risk Management 9, pp. 44-57.
Malcom, D. G., Roseboom, J. H., Clark, C. E. and Fazar, W. (1959) Application of a Technique for Research and Development Program Evaluation. Operations Research, 7, No. 5, pp. 646-669.
McBride, W. and McClelland, C. (1967) PERT and the Beta distribution. IEEE Transactions on Engineering Management , EM-14, No. 4, pp. 166-169.
McCrimmon, K. R. and Ryavec, C. A. (1962 and 1964) An Analytical Study of the PERT Assumptions. Operations Research, 12, No. 1, pp. 16-37.
Megill R.E. (1977). An introduction to risk analysis. Petroleum Publishing Company, Tulsa, OK
Meredith J.R. and Mantel S.J. Jr. (1989). Project management: A managerial approach. 2nd ed. Wiley, New York, 1989.
Meredith J.R. and Mantel S.J. Jr. (2009). Project management: A managerial approach. 7th ed. Wiley, New York, December 2008, ©2009. ISBN 978-0-470-22621-6.
Metropolis, N. (1987). The beginning of the Monte Carlo method. Los Alamos Science (1987 Special Issue dedicated to Stanis?aw Ulam). pp. 125-130.
Moder, Jhosep J. and Phillips, Cecil R. (1970) Project Management with CPM and PERT. Reinhold Publishing Corporation. 2nd Ed. 360 pp.
Moder, Jhosep J. and Rodgers E. G. (1968) Judgment Estimates of the Moments of PERT type Distributions. Management Science, 15 No. 2, pp. B76-83.
Mohan, S., Gopalakrishnan, M., Balasubramanian, H., y Chandrashekar, A. (2007) A lognormal approximation of activity duration in PERT using two time estimates. Journal of the Operational Research Society, 58, pp. 827-831.
Pearson E.S. and Tukey J.W. (1965). Approximate means and standard deviations based on distances between percentage points of frequency curves. Biometrika, 52, pp. 533-546.
Perry, C. and Greig, I. D. (1975) Estimating the mean and variance of subjective distributions in PERT and decision. Management Science, 21,No. 12; pp.1477.
PERT, a dynamic project planning & control method. IBM Data Processing Application. E20-8067-1
PERT, Summary Report - Phase 1 and 2. (1958) Special Projects Office Bureau of Naval Weapons. Department of the Navy.
Premachandra, I. M. (2001) An approximation of the activity duration distribution in PERT. Computers & Operations Research, 28, pp. 443- 452.
Tattoni S. and Schiraldi M.M. (2008). Estimating project duration in uncertain enviroments: Monte Carlo Simulation strikes back. 22nd IPMA World Congress "Project Management to Run". 9-11 November 2008, Roma, Italy.
Tavares L.V., Ferreira J.A. and Coelho J.S. (1999). The risk of delay of a project in terms of the morphology of its network. European Journal of Operational Research, 119, pp. 510-537.
Tavares L.V., Ferreira J.A. and Coelho J.S. (2002). A comparative morphologic analysis of benchmark sets of project networks. International Journal of Project Management, 20, pp. 475-485.
Troutt M.D. (1989). On the generality of PERT average time formula. Decision Science, 20, pp. 410-412.
Troutt, M. D. (1989) On the Generality of the PERT Average Time Formula. Decision Sciences, 20, No. 2, pp. 410
Vanhoucke M., Coelho J.S., Debels D., Maenhout B. and Tavares L.V (2008). An evaluation of the adequacy of project network generators with systematically sampled networks. European Journal of Operational Research, 187, pp. 511-524