Title: Diseño de una guía metodológica alineada con la gestión de proyectos por cadena crítica (CCPM) para la planificación de la etapa de ejecución de proyectos inmobiliarios de grandes superficies
Authors: Africano Olaya, Néstor Darío 
Correa Bueno, Julio César 
metadata.dc.thesis.grantor: Páez Cervantes, Héctor Miguel (dir)
Keywords: Administración de Proyectos
Gerencia
Issue Date: 2015
Publisher: Escuela Colombiana de Ingeniería Julio Garavito
metadata.dc.description.resumen: "La ejecución del trabajo de investigación permitió desarrollar una guía metodológica que brinda solución a los efectos indeseables que ocasionan que los proyectos de construcción de grandes superficies no sean exitosos, proyectos que por lo general se enfrentan a restricciones que dan paso al incumplimiento de sus objetivos y los objetivos de la organización. El documento contextualiza el estado actual de los proyectos de construcción de grandes superficies, al identificarse las restricciones y efectos indeseables que evitan alcanzar el éxito de los proyectos, situaciones que llevan a que la gerencia actual de proyectos de construcción deba ser mejorada en los aspectos que son señalados en el presente documento. Por otra parte se explica cómo la guía metodológica dará solución a las problemáticas que hoy en día presentan los proyectos de grandes superficies, con el fin de satisfacer oportunamente los objetivos estratégicos de la organización."--Extracto del Texto
Abstract: "The execution of the research work allowed the development of a methodological guide that provides a solution to the undesirable effects that cause large-scale construction projects to be unsuccessful, projects that usually face restrictions that lead to non-compliance with their objectives. and the objectives of the organization. The document contextualizes the current status of large-scale construction projects, identifying the restrictions and undesirable effects that prevent the success of the projects, situations that lead to the current management of construction projects to be improved in the aspects that are indicated in this document. On the other hand, it is explained how the methodological guide will give a solution to the problems that large-scale projects present today, in order to timely satisfy the strategic objectives of the organization. "- Excerpt from the Text
URI: http://catalogo.escuelaing.edu.co/cgi-bin/koha/opac-detail.pl?biblionumber=17796
http://repositorio.escuelaing.edu.co/handle/001/281
Appears in Collections:HB - Trabajos de Grado Maestría en Desarrollo y Gerencia Integral de Proyectos

Files in This Item:
File Description SizeFormat 
Africano Olaya, Néstor Darío - 2015.pdfPDF413.65 MBAdobe PDFThumbnail
View/Open
Libro de gerencia.pdfLibro de Gerencia54.85 MBAdobe PDFThumbnail
View/Open
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.