Please use this identifier to cite or link to this item: https://repositorio.escuelaing.edu.co/handle/001/279
Exportar a Bibtex Exportar a RIS Exportar a Excel Buscar en google Schoolar Buscar en microsoft academic
Title: Diseño de dos instrumentos metodológicos que apoyen la gestión del riesgo para los proyectos CNS/ATM de conformidad con el marco jurídico de la Contratación Pública Colombiana
Authors: Colmenares Rincón, Andrés 
Reina Morales, Freddy Alejandro 
metadata.dc.thesis.grantor: López Ruíz, Sofía (dir)
Keywords: Administración de Proyectos
Gerencia
Issue Date: 2015
Publisher: Escuela Colombiana de Ingeniería Julio Garavito
metadata.dc.description.resumen: "El presente trabajo de grado de Maestría de Desarrollo y Gerencia Integral de Proyectos, se ordena de acuerdo con el desarrollo de la investigación y sus etapas que la componen. La primera etapa se realiza una revisión de la literatura frente a los temas de proyectos CNS/ATM, la gestión de los riesgos y el marco jurídico de la contratación pública colombiana, se continua con la etapa de recopilación de datos e información primaria acerca de los proyectos CNS/ATM de la Unidad Administrativa Especial de Aeronáutica Civil (UAEAC), y se realiza una etapa de análisis cualitativo y cuantitativo de la información recopilada con el fin de diseñar la propuesta de dos instrumentos metodológicos para la gestión del riesgo en el proceso de contratación en los proyectos CNS/ATM, por último se establecen las recomendaciones y las conclusiones identificadas en todo el desarrollo de la investigación."--Extracto del texto
Abstract: "The present Master's Degree in Development and Integral Project Management is organized in accordance with the development of the research and its stages, and the first stage is a review of the literature regarding CNS project topics. / ATM, risk management and the legal framework of Colombian public procurement, the primary data and information collection stage is continued regarding the CNS / ATM projects of the Special Administrative Unit of Civil Aeronautics (UAEAC), and a qualitative and quantitative analysis of the information collected is carried out in order to design the proposal of two methodological instruments for risk management in the contracting process in the CNS / ATM projects, finally the recommendations and conclusions are established identified throughout the development of the investigation. "- Excerpt from the text
URI: http://catalogo.escuelaing.edu.co/cgi-bin/koha/opac-detail.pl?biblionumber=17794
http://repositorio.escuelaing.edu.co/handle/001/279
Appears in Collections:HB - Trabajos de Grado Maestría en Desarrollo y Gerencia Integral de Proyectos

Files in This Item:
File Description SizeFormat 
Colmenares Rincón, Andrés -2015.pdfPDF1.63 MBAdobe PDFThumbnail
View/Open
Anexos.rarAnexos8.55 MBRARView/Open
Plan de gerencia.pdfLibro de Gerencia1.04 MBAdobe PDFThumbnail
View/Open
Sustentación.pdfPresentación1.64 MBAdobe PDFThumbnail
View/Open
Show full item record

Page view(s)

1
checked on Nov 9, 2017

Download(s)

3
checked on Nov 9, 2017

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.